 |
|
 |
|
Marketing Office at Site |
|
Erection of street light poles at 45 meter wide road |
|
| |
 |
|
 |
|
Chain link fencing and horticulture work |
|
Front Hoarding at site entry |
|
| |
 |
|
 |
|
Rain Water Harvesting Work |
|
Rain Water Harvesting Work |
|
| |
 |
|
 |
|
Rain Water Harvesting Work |
|
Front–Side, Green Belt Landscaping Work |
|
| |
 |
|
 |
|
RCC pipes testing under progress |
|
Storm Line Excavation and Pipe Laying Work, 24 Meter Wide Road Entrance |
|
| |
 |
|
 |
|
Sub-grade preparation work at 12 Meter wide road, Pocket “Plumeria” |
|
Sewerage Line Excavation and pipe laying work, Pocket “Plumeria” |
|
| |